In late 2021, Protranz successfully completed critical early works for the new Court Theatre building involving complex ground decontamination and site preparation in a sensitive central city location.
Our experienced team, extensive fleet, and end-to-end capability saw us successfully deliver what was a complex site remediation and civil project.
The challenge
The site required careful removal of varying levels of contamination, including asbestos-containing materials, while maintaining strict environmental controls given its location adjacent to key facilities like Te Pae Convention Centre and Tūranga Library.
Our solution
Protranz took the lead on the:
- Installation of sheet piling along property boundaries to enable safe excavation
- Removal of approximately 1,480m³ of asbestos-contaminated material
- Management of 1,110m³ of other contaminated materials
- Construction of a 1.0m engineered gravel raft foundation
- Implementation of comprehensive dust and environmental controls